AI-powered · Construction documents

From construction PDFs to a priced, defensible bid

Upload your bid package — estimates, BOQs, Xactimate, specs, addenda, drawings. Plotform extracts every line item with source-page proof, applies your saved unit rates, and exports an audit-ready Excel that holds up in review. Under 20 minutes.

No credit card · 100 free pages · Your data stays private

New project

Enter a name and choose a project category.

Hospital fit-out — Bid 2026-06

Project category

Insurance
Restoration
CSI
Divisions
Custom

Pick divisions per file at upload. Each runs its own focused pass.

Create project
Cancel
Live demo

See it in action

Upload, extract, review — in under 20 minutes.

Upload

Drop your PDF here

Bid Package · 4-Story Mixed-Use.pdf

Uploading…

Extracting line items…

page 23 of 108

SectionDescriptionQtyMy RateMy Total
ConcreteSlab on grade, 6" with WWF420$185.00$77,700
DrywallGypsum board 5/8" Type X6,180$1.85$11,433
HVACAHU-1, 5,000 CFM1$28,400.00$28,400
ElectricalPanelboard PA-1, 225A 42-ckt1$4,200.00$4,200
RestorationDrywall repair — Unit 122180$2.40$432
612 line items extracted · ready to edit
10+

Verticals — purpose-built extraction per trade

15 min

Typical processing per 80-page document

99%+

Line item extraction accuracy

Stop wrestling with construction documents

The way teams handle documents today wastes hundreds of hours. There’s a better way.

The old way

  • Hours retyping line items from PDFs into spreadsheets
  • Manually applying vendor rates row-by-row to get a bid number
  • Missing the addendum that revised a quantity after you priced it
  • Junior staff burned on data entry instead of judgment work
  • No defensible trail when an adjuster or sub disputes a number

With Plotform

  • Upload the package — line items extracted, tagged by CSI division
  • Apply your saved rate template — priced subtotal in one click
  • Cross-document badges flag addenda revisions automatically
  • Generate change-order / scope-gap reports with net cost impact
  • Excel ships with source page, verbatim quote, audit cover, sign-off

What you get

Built specifically for construction document workflows.

Quantities → priced bid

Save your unit rates once as a template (paste vendor CSV directly). Apply on any project — Excel ships with My Rate, My Total, Rate Source, and a priced subtotal. The output you need to submit, not just the raw quantities.

Audit-defensible Excel

Default export is a deliverable: cover sheet with confidence breakdown, source page + verbatim quote on every line, sign-off section. Hands-off enough for an adjuster, QS, or counsel to verify.

Catches addenda + scope gaps

Cross-document badges flag the same item across spec + BOQ + addenda — and warn when qty or unit changed. Generate Change Order / Scope Gap / Bid Comparison reports with net cost impact in one click.

Teams across the trades, shipping faster

What contractors, estimators, and adjusters say after switching.

We doubled our bid volume without hiring. The takeoff that used to take a day takes an hour now.

Drywall estimator, Phoenix

Bid leveling was a full week of spreadsheet work. Now it’s an afternoon with cleaner numbers.

Chief estimator, Chicago

Cuts our supplement prep time in half. We’re processing claims in a single sitting now.

Restoration team, Texas

Upload to bid number in 4 steps

No training. No new spreadsheet. Just upload, price, and export.

01

Upload

Drop your PDFs. For each file, pick CSI divisions and Documents vs Drawings. Up to 500 pages.

02

Extract

AI runs a focused pass per division. Every item gets a confidence score, source page, and verbatim quote.

03

Apply rates

Pick your saved rate template. Plotform matches items to your unit prices (fuzzy — handles wording diffs) and prices the bid.

04

Audit pack

Export Excel with cover sheet, per-division sheets, source proof on every line, sign-off section. One click.

Per-file picker · step 01

Upload settings

Tell us what's in this file and which divisions to focus on.

What's in this file?

Documents
BOQ, Xactimate, proposals
Drawings
Plans, sections

Divisions · 2 of 17

Select all·Clear
Div 1 — General
Div 2 — Site
Div 3 — Concrete
Div 4 — Masonry
Div 5 — Metals
Div 9 — Finishes
Div 15 — Mechanical
Div 16 — Electrical
Cancel
Upload for takeoff · 2 divisions

A drywall sub picks only Div 9. A masonry sub picks Div 4. Each gets a focused extraction tuned to their trade.

Excel deliverable · step 04

project-export.xlsx · Audit Cover
AUDIT PACK
Hospital fit-out — Bid 2026-06
Generated by Plotform.ai · June 2026
EXTRACTION CONFIDENCE
High189 · 76%
Medium42 · 17%
Low17 · 7%
CROSS-DOCUMENT REFERENCES
Items in multiple files23
Qty / unit discrepancy4 ⚠
PRICING
Items priced198 / 248 · 80%
Priced subtotal$17,160.50
SIGN-OFF
Prepared by ___________________
Date ___________________

The default export is audit-ready: extraction confidence breakdown, cross-document discrepancies, pricing impact, sign-off lines. Defensible enough for an adjuster or QS.

Built for every role on site

From GCs to insurance adjusters, Plotform adapts to how you work.

General Contractors

Side-by-side sub-bid comparison, normalized line items, scope-gap detection before award.

Subcontractors

10+ trades supported. Bid more jobs per week with the same estimating team.

Quantity Surveyors

Bid review and BOQ processing at volume. Organized by CSI division automatically.

Insurance Restoration

Xactimate estimates extracted by unit and room. Supplement prep in half the time.

How much could you save?

Adjust the numbers to match your team — the savings update live.

Your numbers

Your savings with Plotform

Monthly savings
$2,250
Hours back per month
45 hrs

Estimated assuming Plotform replaces 75% of manual data-entry time on each project.

Start free with 100 pages — no credit card

Upload your first construction document and see every line item extracted in minutes.

100 free pages · No credit card required

Frequently asked questions

Everything you need to know before getting started.

What kinds of construction documents do you handle?

Contractor proposals, BOQs, Xactimate estimates, RFP packages, spec books, addenda, drawings with schedules — any PDF that carries line items, quantities, or measurable scope. Purpose-built extraction per CSI division: pick the trades you care about for each file and the AI focuses there.

Can I apply my own unit rates to get a priced bid?

Yes. Save your unit rates once as a rate template (paste your vendor CSV directly), then apply that template to any project on export. The Excel output gets My Rate, My Total, Rate Source columns and a priced subtotal — so you go from extracted quantities to a defensible bid number in one click. Fuzzy matching handles wording differences across documents.

How accurate is the extraction?

Every line item carries a confidence indicator and a source-page reference, and the Excel export includes the verbatim quote from the original. Verification is a click rather than a re-read.

What is the Audit Pack export?

The default Excel export is an audit-ready deliverable: cover sheet with extraction confidence breakdown, cross-document references, pricing impact (when rates applied), methodology block, and sign-off lines. Every line item ships with its source page, verbatim quote, and cross-reference flags — defensible enough for adjusters, QSs, and disputes.

Do you catch revisions and addenda?

Yes. Upload the original BOQ + the addendum as separate files in one project; we cross-link them automatically. The Summary tab shows lineage badges where items appear in multiple files, with discrepancy warnings when quantities or units changed. Generate a Change Order report for a full delta — added, removed, qty-revised — with net cost impact.

Do you do takeoff from architectural drawings alone?

Yes, when scope is clear. Mark a file as Drawings at upload and pick the divisions you care about; the Takeoff tab reads scale, dimensions, and material callouts to produce a measured takeoff focused on those trades. Documents (line-item lists) still go through the standard extraction path.

Is my data secure?

Yes. Files are private to your workspace, encrypted in transit and at rest, and never used to train models or shared with other users.

How long does processing take?

Typically 5–30 minutes depending on package size and how many CSI divisions you selected. An 80-page document scoped to one division finishes in ~15 minutes; a multi-division pass over the same file is roughly N×.